Edit Constraints Dialog Box

The initial curve shown assumes no constraints on any of the asset classes.

To enter constraints:

  1. In the Min % column, enter the minimum percentage of assets you want in the specific asset class.

  2. In the Max % column, enter the maximum percentage of assets you want in the specific asset class.

Note: To return to no constraints, click . All entries in the Min % column revert back to 0, and all entries in the Max % column revert back to 100. Click OK.